{"id":831,"date":"2021-12-29T12:25:47","date_gmt":"2021-12-29T10:25:47","guid":{"rendered":"https:\/\/sites.uwasa.fi\/kampushanke\/?p=831"},"modified":"2021-12-29T12:26:01","modified_gmt":"2021-12-29T10:26:01","slug":"a-busy-year-of-campus-development-renovation-of-luotsi-in-full-swing","status":"publish","type":"post","link":"https:\/\/sites.uwasa.fi\/kampushanke\/en\/2021\/12\/29\/a-busy-year-of-campus-development-renovation-of-luotsi-in-full-swing\/","title":{"rendered":"A busy year of campus development \u2013 Renovation of Luotsi in full swing"},"content":{"rendered":"<p><span lang=\"EN-GB\" xml:lang=\"EN-GB\">The past year has been significant for the campus development project in many ways. The plans for the project were specified by the summer and could be implemented in early autumn.<\/span><\/p>\n<p><span lang=\"EN-GB\" xml:lang=\"EN-GB\">Construction work on the campus has progressed at an accelerating pace towards the end of the year. The most prominent steps have been related to the Luotsi building, where demolition and priming work is currently being carried out.<\/span><span lang=\"EN-GB\" xml:lang=\"EN-GB\">\u00a0The Luotsi building renovation started in October. The building will be completely renovated and an additional wing will be built.<\/span><\/p>\n<p><span lang=\"EN-GB\" xml:lang=\"EN-GB\">The second phase of the renovation of the auditorium Lev\u00f3n is also almost complete, and the hall has been partially in use since the beginning of the autumn. The biggest changes are related to the technology and the edges of the hall where landings were built. They will allow more versatile and efficient use of the auditorium.<\/span><\/p>\n<p><span lang=\"EN-GB\" xml:lang=\"EN-GB\">\u201cThe hall will be finished at the beginning of next year when the furniture for the side landings will arrive in early January\u201d, says <strong>Anne-Mari Vatunen<\/strong>, vice-director of Campus Services.<\/span><\/p>\n<p><span lang=\"EN-GB\" xml:lang=\"EN-GB\">During the coming year, the work on campus will continue with the next phase of the Tritonia building.\u00a0The renovation of the Tritonia building is estimated to begin in August 2022.\u00a0The last step is to turn Tervahovi into a student house.<\/span><\/p>\n<p><span lang=\"EN-GB\" xml:lang=\"EN-GB\">Involvement has been at the centre of campus development from the beginning. Over the past year, several working groups to which any of the staff or students may have joined have been involved in the development. In the spring, students were also given opportunities to influence at events, such as surveys and workshops. Information and feedback from staff and students will be extensively utilised in planning the campus.<\/span><\/p>\n<p><span lang=\"EN-GB\" xml:lang=\"EN-GB\">We will tell you about the following steps next time next year.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The past year has been significant for the campus development project in many ways. The plans for the project were specified by the summer and could be implemented in early autumn. Construction work on the campus has progressed at an accelerating pace towards the end of the year. The most prominent steps have been related [&hellip;]<\/p>\n","protected":false},"author":144,"featured_media":829,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-831","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-yleinen"],"acf":[],"lang":"en","translations":{"en":831,"fi":828},"post_meta":"<span class=\"author\"> <span class=\"vcard\"><a class=\"url fn n\" href=\"https:\/\/sites.uwasa.fi\/kampushanke\/author\/tramsila\/\">Verkkotoimitus<\/a><\/span><\/span><span class=\"posted-on\"><a href=\"https:\/\/sites.uwasa.fi\/kampushanke\/en\/2021\/12\/29\/a-busy-year-of-campus-development-renovation-of-luotsi-in-full-swing\/\" rel=\"bookmark\"><time class=\"entry-date published updated\" datetime=\"2021-12-29T12:25:47+02:00\">29.12.2021<\/time><\/a><\/span>","post_categories":"<span class=\"entry-categories cat-links\"><a href=\"https:\/\/sites.uwasa.fi\/kampushanke\/en\/category\/yleinen\/\" rel=\"category tag\">Yleinen<\/a><\/span>","post_thumbnail":"<a href=\"https:\/\/sites.uwasa.fi\/kampushanke\/en\/2021\/12\/29\/a-busy-year-of-campus-development-renovation-of-luotsi-in-full-swing\/\"><img width=\"640\" height=\"360\" src=\"https:\/\/sites.uwasa.fi\/kampushanke\/wp-content\/blogs.dir\/4\/files\/sites\/73\/2021\/12\/kampus-talvella-tritonia-640x360.jpg\" class=\"attachment-banner-wide-640 size-banner-wide-640 wp-post-image\" alt=\"\" decoding=\"async\" loading=\"lazy\" srcset=\"https:\/\/sites.uwasa.fi\/kampushanke\/wp-content\/blogs.dir\/4\/files\/sites\/73\/2021\/12\/kampus-talvella-tritonia-640x360.jpg 640w, https:\/\/sites.uwasa.fi\/kampushanke\/wp-content\/blogs.dir\/4\/files\/sites\/73\/2021\/12\/kampus-talvella-tritonia-320x180.jpg 320w\" sizes=\"(max-width: 640px) 100vw, 640px\" \/><\/a>","pll_sync_post":[],"_links":{"self":[{"href":"https:\/\/sites.uwasa.fi\/kampushanke\/wp-json\/wp\/v2\/posts\/831"}],"collection":[{"href":"https:\/\/sites.uwasa.fi\/kampushanke\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.uwasa.fi\/kampushanke\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.uwasa.fi\/kampushanke\/wp-json\/wp\/v2\/users\/144"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.uwasa.fi\/kampushanke\/wp-json\/wp\/v2\/comments?post=831"}],"version-history":[{"count":2,"href":"https:\/\/sites.uwasa.fi\/kampushanke\/wp-json\/wp\/v2\/posts\/831\/revisions"}],"predecessor-version":[{"id":833,"href":"https:\/\/sites.uwasa.fi\/kampushanke\/wp-json\/wp\/v2\/posts\/831\/revisions\/833"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sites.uwasa.fi\/kampushanke\/wp-json\/wp\/v2\/media\/829"}],"wp:attachment":[{"href":"https:\/\/sites.uwasa.fi\/kampushanke\/wp-json\/wp\/v2\/media?parent=831"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.uwasa.fi\/kampushanke\/wp-json\/wp\/v2\/categories?post=831"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.uwasa.fi\/kampushanke\/wp-json\/wp\/v2\/tags?post=831"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}